Visit the Whitehouse Scientific web site
Click on the advert above to visit the company web site

Product category: Calibration and Laboratory Instruments
News Release from: Chell Instruments | Subject: AIM real time measurement of air ingress
Edited by the Manufacturingtalk Editorial Team on 20 January 2006

Real time measurement of air ingress

Request your FREE weekly copy of the Manufacturingtalk email newsletter. News about Calibration and Laboratory Instruments and more every issue. Click here for details.

Excessive air in-leakage and ineffective non-condensable gas removal can lead to condenser inefficiencies of over 20%.

Excessive air in-leakage and ineffective non-condensable gas removal can lead to condenser inefficiencies of over 20% One generator recently estimated the cost of air in-leakage on a 500 MW turbine to be in excess of £1000 per mbar per week

In addition to this increased generation cost, the man-hours taken to locate the source of leaks were also of major concern.

Chell Instruments' third generation AIM provides real time measurement of air ingress, enabling trends to be picked up at an early stage and allowing relevant remedial action to be taken.

Once air in-leakage is detected, comparison with historical data of the individual measured parameters under differing plant load conditions and with other plant measurements is useful in indicating the most likely source.

Additionally, the AIM assists in the diagnosis of tube fouling and air blanketing of the condenser.

An averaging pitot tube with integral PRT temperature sensor is installed downstream of the condenser and is connected to a locally mounted AIM by two flexible 1/2" diameter hoses and the PRT cable.

Continuous output of all the measured parameters via 4-20 mA signals and the RS232/485 interface allow data logging, further analysis of the information or integration into the plant management system.

There is an overwhelming economic case for the installation of an AIM after each condenser where inefficiencies are suspected and payback can be as short as 1 week.

Chell provide full after-sales support including calibration in their ISO17025 accredited UKAS Laboratory No.

0687.

Chell Instruments: contact details and other news
Email this article to a colleague
Register for the free Manufacturingtalk email newsletter
Manufacturingtalk Home Page

Search the Pro-Talk network of sites

Visit the Whitehouse Scientific web site