Visit the Flir Systems web site
Click on the advert above to visit the company web site

Product category: Manufacturing orders, contracts, financial reports
News Release from: in2grate
Edited by the Manufacturingtalk Editorial Team on 03 September 2003

Lifesciences equipment manufacturer
signs up in IT

Request your FREE weekly copy of the Manufacturingtalk email newsletter. News about Manufacturing orders, contracts, financial reports and more every issue. Click here for details.

Integration and automation specialist, in2grate, is to supply its joined-up Manufacturing IT solution in a GBP 160,000 deal with leading lifesciences manufacturer, Manesty.

Integration and automation specialist, in2grate, announces a major business win to supply its joined-up Manufacturing IT solution, d2order, to leading lifesciences manufacturer, Manesty Now part of the IWKA group, Manesty has supplied tablet compression and coating systems to the global pharmaceutical industry for more than 65 years

The contract, worth GBP 160,000, is for 60 seats and is expected to be completed by the end of 2003.

Bob Clements, Managing Director of in2grate, comments on the nature of the Manesty implementation.

"Like many design and engineer to order companies, Manesty had lots of silos of disconnected information.

It had used a PDM system but this didn't adequately resolve the connectivity issues, or the contract management difficulties inherent in this type of contract driven business.

Manesty accurately discerned 2 issues and we identified one common problem, a lack of visibility of information.

It was immediately clear that d2order would provide the joined-up solution that Manesty needed." The d2order solution being implemented at Manesty comprises a PDM system fully integrated with a job contract control system.

Each user is provided with a common user interface on the desktop which provides seamless visibility and access to all relevant areas of both systems.

Duplication is removed at every stage of the business process therefore liberating considerable savings in terms of accuracy and timeliness of information.

Manesty's Jeff Robinson outlines why they chose the d2order solution.

"Most business system vendors fail to appreciate the specific requirements of the contract, design to order environment, on the premise that all manufacturing organisations produce pre-designed products to sell off the shelf.

Right from initial discussions it was clear that in2Grate fully understood that the design to order cycle starts at the enquiry stage right through to the after-delivery installation and service requirements." Manesty has high expectations from d2order which both in2grate and Manesty are confident will be delivered, as Robinson concludes.

"Consistency of specification from Enquiry through to Service Delivery is key to ensuring accurate cost and margin control.

By controlling the whole process d2order will ensure that these critical business factors are consistently achieved.".

in2grate: contact details and other news
Email this article to a colleague
Register for the free Manufacturingtalk email newsletter
Manufacturingtalk Home Page

Search the Pro-Talk network of sites

Visit the Flir Systems web site