Product category:
Personal protective equipment (PPE), devices
News Release from: Lifting Solutions
Edited by the Manufacturingtalk Editorial
Team on 20 September 2005
Lifting Solutions looks ahead to 2012
Lifting Solutions has responded positively to news that London will host the 2012 Olympic Games, with a buoyant message that the UK's engineering sector is in good shape to support the event.
Lifting Solutions of Barnsley has responded very positively to news that London will host the 2012 Olympic Games, with a buoyant message to the organisers that the UK's engineering sector is in good shape to support the event Lifting Solutions is no stranger to Olympic projects, having supplied an incredible length of almost 25km of 7mm and 8mm diameter rope for the opening and closing ceremonies at Athens 2004
This article was originally published on Manufacturingtalk on 14 Feb 2005 at 8.00am (UK)
Related stories
Wire rope structure supports 8200m2 of banners
Lifting Solutions has supplied an enormous supporting structure of steel wire rope holding up what is believed to be Europe's largest ever banner.
Stainless steel wire swaged products included
Lifting Solutions of Barnsley is adding to its growing industry reputation by strengthening its customer offering to include stainless steel wire swaged products.
Handling/lifting supplier adds on machine shop
Supplier of lifting, handling and cranage equipment has added on its own machine shop to produce its own pins, bushes, pulleys, gear blanks and pinion shafts.
At one point during the rope's fabrication in Barnsley, European supplies of the appropriate diameters of steel wire rope were completely exhausted.
Lifting Solutions has, indeed, already played its part in helping secure the Games; the company supplied an enormous supporting structure of steel wire rope to hold up what is believed to be Europe's largest ever banner - for the IOC London 2012 Evaluation Committee visit to London last February.
The giant banner was erected on the roof of The Dome, covering 8200 square metres of the structure's roof, and is thought to be the largest building wrap ever constructed in Europe.
The company has supplied over 5km of steel wire rope in a range of diameters - 12mm, 16mm and 19mm.
Jonathan Moorhouse, managing director of Lifting Solutions, said: "It is fantastic that London has won the Olympics and we are ready to support the organisers or any of the major contractors in whatever way we can.
"We are now highly experienced in this type of project, which will hopefully stand us in good stead when the contracts are being awarded".
For further information visit the company's website.
• Lifting Solutions: contact details and other news
• Email this article to a colleague
• Register for the free Manufacturingtalk email newsletter
• Manufacturingtalk Home Page

