<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="2.0">
  <channel>
    <title>RSS News Feed for Spaceway South - from Manufacturingtalk</title>
    <link>http://www.manufacturingtalk.com/news/spc/spc000.html</link>
    <description>Spaceway South news releases on Manufacturingtalk</description>
    <language>en-gb</language>
    <copyright>Copyright (C)2008 Pro-Talk Ltd. All rights reserved.</copyright>
    <pubDate>Wed, 19 Nov 2008 08:00:00 UT</pubDate>
    <lastBuildDate>Wed, 19 Nov 2008 08:00:00 UT</lastBuildDate>
    <image>
      <title>Pro-Talk Ltd</title>
      <url>http://www.pro-talk.com/images/protalklogo90.gif</url>
      <link>http://www.pro-talk.com/</link>
      <width>90</width>
      <height>79</height>
    </image>
    <item>
      <title>Distribution centre fitting outsourced</title>
      <description>Respironics, sleep and respiratory provider, chose Spaceway South to fit out its distribution centre, which included offices and warehouse space with a range of racking and shelving.</description>
      <pubDate>Thu, 19 Apr 2007 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc106.html</link>
    </item>
    <item>
      <title>Project management of fit-out for lens centre</title>
      <description>Spaceway Group was chosen by Coopervision to fit out a distribution centre for its lens products.</description>
      <pubDate>Fri, 23 Feb 2007 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc105.html</link>
    </item>
    <item>
      <title>Soundproofed mezzanine floor for offices</title>
      <description>Turning to Spaceway to find a solution, Bott set about finding a way of installing a mezzanine floor that would soundproof the offices from the clamour of the machinery below.</description>
      <pubDate>Mon, 01 Jan 2007 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc104.html</link>
    </item>
    <item>
      <title>Industrial engineering building fitted in 6 weeks</title>
      <description>When an engineering company had to find new premises at short notice, a factory services company was able to redesign and fit out a large industrial building in just six weeks.</description>
      <pubDate>Tue, 25 Apr 2006 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc103.html</link>
    </item>
    <item>
      <title>Turnkey capability gained fitting-out contract</title>
      <description>Spaceway South's ability to provide a complete turnkey operation has resulted in the company winning the contract to fit out a prestigious and functional UK headquarters for Delacamp.</description>
      <pubDate>Thu, 09 Mar 2006 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc102.html</link>
    </item>
    <item>
      <title>Maximise the use of factory space</title>
      <description>As the price of property soars, more and more businesses are looking for ways of maximising the amount of space available to them, writes Malcolm Jeary.</description>
      <pubDate>Fri, 04 Nov 2005 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc101.html</link>
    </item>
    <item>
      <title>E-commerce website expected to triple business</title>
      <description>Integrated interior space solutions company, Spaceway, is expecting to triple the turnover of its Storage And Consumables division (SAC) with the launch of a new e-commerce website.</description>
      <pubDate>Mon, 08 Nov 2004 08:00:00 UT</pubDate>
      <category>Spaceway South</category>
      <link>http://www.manufacturingtalk.com/news/spc/spc100.html</link>
    </item>
  </channel>
</rss>
